Why Truck Fleets Are Screaming for Mobile Charging Solutions 🚛
Let’s cut to the chase: range anxiety isn’t just for Tesla owners. Trucking companies are drowning in these pain points:
- Deadlines vs. Dead batteries: 78% of logistics delays trace back to charging downtime.
- Infrastructure deserts: 60% of highway routes lack heavy-duty charging stations.
- $9,000/hour penalty fees for late deliveries – ouch.
Enter the game-changer: Tursan’s 30kW Mobile EV Charging.

How This Beast Works (Spoiler: It’s Not Your Grandpa’s Generator)
Feature | Traditional Charging Station | Tursan 30kW Mobile Charger |
---|---|---|
Deployment Time | 6-12 months (permits hell) | 2 hours |
Cost per kWh | $0.40 | $0.22 |
Max Trucks Charged/Day | 4 | 12 |
ROI Timeline | 5+ years | 8 months |
Data from Tursan’s 2023 client case studies
This rig’s secret sauce? BYD-sourced LiFePO4 batteries (same tech in Tursan’s 5.22kWh Home Backup Battery) paired with military-grade inverters. Translation? It’s a charging ninja that works in -20°C blizzards or 50°C desert heat.
Real-World Scenarios Where This Shines
1. Disaster Relief Logistics
When Hurricane Lisa wiped out Florida’s power grid, Coastal Freight Co. deployed 3 Tursan units to keep 28 electric semis running. Result? 92% on-time delivery rate vs. industry avg. of 34% during crises.
2. Pop-Up Charging at Festivals
Burning Man 2023: 7 mobile chargers powered 140 EV food trucks. Organizers slashed generator costs by 62%.
3. Mining Site Savior
Rio Tinto’s EV dump trucks saved 11,000 gallons of diesel monthly by using 30kW Mobile EV Charging.

Why Smart Money’s Betting on Tursan
- Exclusive Distribution Rights: Lock down your territory – Tursan won’t flood your market (distributor details).
- 5-Stage QC Process: Their portable power station factory churns out units with <0.01% defect rate.
- 72-Hour Custom Designs: Need a charger that doubles as a billboard? Done.
The Bottom Line
While competitors are stuck selling “me-too” power banks, Tursan’s solving the $217B electric truck charging gap. Whether you’re running last-mile deliveries or disaster ops, this isn’t just gear – it’s an insurance policy against operational meltdowns.
Pro Tip: Pair it with their 10kW Hybrid Inverter for off-grid sites. Your CFO will high-five you when the fuel savings report drops.